BOAB 50L Poly Diesel Fuel Tank Universal Ute Tray/Wagon Floor Mount FTP50T
SKU code: FTP50T
BOAB Poly Diesel Fuel Tank 50 Lt Taper Rectangular Universal Fitment - for Ute Tray or Wagon Floor mounting. Yellow Colour Dimensions: 1000mm wide x 350mm high ( 30mm for cap). Depth tapers from 200mm at the base to 150mm at the top. The brass outlet fitting is 1/2" BSPT female thread and a hose adaptor to suit 3/8" (10mm) hose is included.Capacity note: Poly tanks are roto-molded using an oven. Tanks cool at different rates depending on the time of year and this can lead to different levels of shrinkage - thus to small variances in capacity between the same model of tank. Stated capacities are approximate. Part number: FTP50T
| SKU | FTP50T |
| Brand | BOAB |
| Shipping Weight | 8.0000kg |
| Shipping Width | 0.990m |
| Shipping Height | 0.400m |
| Shipping Length | 0.550m |
Be The First To Review This Product!
Help other 4WD Industries users shop smarter by writing reviews for products you have purchased.
More From This Category
BROWN DAVIS RAM 2016-PRESENT 1500 -DS MODELS 120L TRANSFER AUXILIARY DRAM16A2
$2,564.10
Orders from Brown Davis may take up to 12 weeks to be fulfilled.
BROWN DAVIS LANDCRUISER 75 SERIES FJ/HJ75/HZJ75- TRAY- 6CYL 170L AUXILIARY TL76A2
$2,075.70
Orders from Brown Davis may take up to 12 weeks to be fulfilled.
BROWN DAVIS SPRINTER 2019-PRESENT EXTRA LONG WHEELBASE VAN 175L REPLACEMENT MBS19R5
$2,136.75
Orders from Brown Davis may take up to 12 weeks to be fulfilled.
BROWN DAVIS RANGER 2007-2011 SINGLE CAB | TWIN CAB 126L REPLACEMENT FR07R3
$1,514.04
Orders from Brown Davis may take up to 12 weeks to be fulfilled.
BROWN DAVIS LANDCRUISER 40 SERIES BJ/FJ40- SHORT WHEEL BASE- 110L RELOCATION TL40R3
$1,684.98
Orders from Brown Davis may take up to 12 weeks to be fulfilled.
BROWN DAVIS PATROL GU Y61 1997-PRESENT LWB 90L AUXILIARY NPGUA2-50
$1,465.20
Orders from Brown Davis may take up to 12 weeks to be fulfilled.
BROWN DAVIS TRITON MR (2019-PRESENT) L UGMTMQ
$665.45
Orders from Brown Davis may take up to 12 weeks to be fulfilled.